Labour Camp/Mining Camp/Camp House/Worker Camp/Oilfield Camp

Labour Camp/Mining Camp/Camp House/worker camp/oilfield campGeneral technical description for standard container house modelTechnical Parameter:Size: GP20, GP40 and HP40 of shipping containerWind Resistance: Grade 12Wall permitted loading: 0.6KN/ m2Ceiling Permitted live loading: 0.5 KN/m2Wall Coefficient of thermal conduc

Featured Products

Labour Camp/Mining Camp/Camp House/worker camp/oilfield camp

General technical description for standard container house model

Technical Parameter:

Size: GP20, GP40 and HP40 of shipping container

Wind Resistance: Grade 12

Wall permitted loading: 0.6KN/ m2

Ceiling Permitted live loading: 0.5 KN/m2

Wall Coefficient of thermal conductivity: K=0.442W/mk

Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K

You are so welcome to send us inquiries!

Characters:

1) Good ability to assemble and disassemble for several times without damage.

2) Could be lifted, fixed and combined freely.

3) Heatproof and waterproof.

4) Cost saving and convenient transportation (Each 4 container house can loaded in one standard container)

5) Service life can reach up to 15 - 20 years

6) We can provide the service of installation, supervision and training by extra.

Dimensions and Weight

Inner length /external length: 5.81m/6.06m
Inner width /external width: 2.188m/2.438m
Inner height/external height: 2, 410m/2.591m
Weight: 2000kg per unit

Steel framework

Material: Steel material Q345, thickness: 3.5mm, for top beam frame. Base beam frame and column.
Surface working: Epoxy painting, two bottom and two surface.
Fittings: 8 standard container corner mould fittings PVC standard rainwater pipe
Forklift openings: Size 100*250mm, distance is 1200mm

Floor

External wainscot: Flat galvanized color steel sheet, 0.5mm thickness
Floor structure: Girder made of 3.5mm steel. The purlin is C section steel. Dimension 60x40x1.5mm.
Warm proof Insulation layer: 75mm rock wool
18mm bamboo plywood
2.0mm PVC floor leather for living rooms floor;

Ceiling

Construction:
Roof exterior layer: 1.2mm steel plate with epoxy painting
Warm proof insulation filling: 75mm rockwool between C section purlins;
Inner wainscot: 8mm OSB board with 12mm PVC decoration board.
Roof water drain: 4 PVC rainwater pipes in the corner pillars, diameter 50mm

Walls

Panel width: 1150mm; Panel total thickness: 75mm, five panels fit into the long side and two panels fit into the short side.
Construction:
Common room wall: 75mm rockwool 0.4/0.4mm Galvanized
Steel on both side, Desity of Rockwool: 120Kg/m3
Galvanize window opening on the wall if needed.

Door

External door: Insulated with opening dimension 950*2100mm, furnished with lock
With 3keys. Inner door: Insulated steel door.

Windows

Window material: PVC window with fly screen. Double glass, 4mm glass.

Electrical fittings option

Electrical wire, 2.5mm2 for lighting system, and 4mm2 for AC units.
Main outlet and input industrial socket with 32A.
3 pcs 16A five hole universal socket.
2 pc double tube fluorescent lamp, 220V, 50-60HZ
1 pc Single Switch, Honyar brand, with junction box
1 pc Electrical distribution box, box+breakers+earth leakage protective device

Optional Water system fittings

Water drain pipe, PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years.
Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC

Sanitary ware:
Western Close tool: Ceramic, with pipes and installation fittings
Urinal: Ceramic, with pipes and installation fittings
Wash basin: Ceramic, with post, faucet, pipes and installation fittings
Shower head, Shower base, Water mixture

We would like to give fully support for your further inquiry!

Best regards
Steven Chen
---------------------------------------------------------
Weifang Henglida Steel Structure Co., Ltd.
Add: Room1102, Unit B, Zhonghui Commercial Building, Qingdao, 266000, China
Tel: 0086-532-88966982 Fax: 0086-532-88965571
Moble: KSA: 00966-548943324 China: 0086-13869829462
NoItemLabour Camp/Mining Camp/Camp House/worker camp/oilfield camp
1Frame 
1.1Steel Frame3.5mm Steel profile, welding,rust removal,  epoxy painting
1.2floor supportwelding,rust removal,painting
1.3fork lift open 
2Roofing
2.1outer steel sheet1.2mm Steel proceed,epoxy painting
2.2steel keel 
2.3insulation layer120Kg/m 3
2.4 Plywood with Wooden color finish 
3Wall
3.1EPS sandwich panel75mmEPS sandwich panel,0.4/0.4mm,12Kg/m3
3.2outer doorincluding door lockers,etc
3.3PVC sliding window4mm glass,with window screen
4Floor
4.1floor leatherincluding glue
4.2plywood 
4.3insulation120Kg/m 3
4.4floor bottom board 
5Electricity System
5.1common socket5 hole Universal
5.2air conditioner socket16A
5.3lightsingle tube fluorescent lamp,without cover,38W
5.4electric wirethree colors
5.5double connection plane switch  
5.6distribution board 
6Others
6.1lift corner piecestandard parts
6.2Rainspout 
6.3Accessoriesself-tapping screw,glue,edge cover,etc

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours